Kittens. I have been with Blogger for many years, but due to wanting to get on iTunes and not wanting to update more than 1 blog any longer, it is finally time for me to move. I will no longer be updating this site, but you can find me and future blog entries/podcast episodes over at sewknitpicky.net on WordPress.
It's been great and I hope to see you all there!
01 January, 2014
18 December, 2013
Knot A Podcast: Episode 52
♥ Please come join us in the Ravelry group!
♥ You can also find the podcast on YouTube if you'd prefer to watch there. Please remember to give my videos a thumbs up!
Show Notes: "Holiday Rush"
WiPs:
♥ Frances the Sock Wearing Fox
♥ Moderne Log Cabin Blanket
Spinning A Yarn:
♥ Spun Right Round BFL in "Love Bug"
Stitcher's Corner:
♥ Halloween Spooky Sampler by The Frosted Pumpkin Stitchery
11 December, 2013
Knot A Podcast: Episode 51
♥ Please come join us in the Ravelry group!
♥ You can also find the podcast on YouTube if you'd prefer to watch there. Please remember to give my videos a thumbs up!
Show Notes: "Short One"
FOs:
♥ Rainbow Twist 1
♥ Rainbow Twist 2
WiPs:
♥ Frances the Sock Wearing Fox
Spinning a Yarn:
♥ Spun Right Round BFL
Stitcher's Corner:
♥ Halloween Spooky Sampler by Frosted Pumpkin Stitchery
04 December, 2013
Knot A Podcast: Episode 50
♥ Please come join us in the Ravelry group!
♥ You can also find the podcast on YouTube if you'd prefer to watch there. Please remember to give my videos a thumbs up!
Show Notes: "Big Things"
FOs:
♥ Blanket O' Doooom
♥ Hitchhiker #4...out of handspun!!
♥ Sockhead-like hat out of Yarntini Sport in "Vintage Stripe"
WiPs:
♥ Frances the Sock Wearing Fox x 2
Stash Enhancement:
♥ Orla Kiely Train Case to hold my spinning
♥ Cat's Pajamas Crafts stitch markers
♥ Moonrover SW Merino
♥ Gourmet Stash -punis sampler and Lo-Lo Bar
♥ Malabrigo Nube and Rasta from Eat.Sleep.Knit
02 December, 2013
November 2013: wrap-up
Yardage Totals 2013:
January: 869yds
February: 1,038yds
March: 1,100yds
April: 1,251yds
May: 1,112yds
May: 1,112yds
June: 452yds
July: 453yds
August: 169yds
September: 781yds
October: 815yds
November: 780yds
July: 453yds
August: 169yds
September: 781yds
October: 815yds
November: 780yds
Year To Date: 8,820yds or 5.01 miles
Kittens, I did actually knit a bit more than that in November, but I was sloppy this month and forgot to check the partial tallies on several of my projects. Instead, they'll go in with my December numbers and make it look like I was even more productive and amazing! I slagged off on cross-stitching this month which definitely increased my knitting productivity. Onward to December. ♥
20 November, 2013
Knot A Podcast: Episode 49
Knot A Podcast: Episode 49 from SewKnitpicky on Vimeo.
♥ Please come join us in the Ravelry group!
♥ You can also find the podcast on YouTube if you'd prefer to watch there. Please remember to give my videos a thumbs up!
Show Notes: "Public Shaming"
♥ There are a few days left to enter the DDD raffle if you are so inclined! You could win 3,6, or 12 months' worth of free yarn on her sock or worsted base.
♥ Subversive Socks is a fun new pattern book release. I was mistaken about the pattern numbers in this book. There are 14 of them for $16.95. These are some of my favorite patterns from it.
FOs:
♥ Scooby-Doo Sockhead-like hat
WiPs:
♥ Vintage Sockhead-like hat
♥ Blanket O' Dooooom is back in rotation! Mentioned the Bear Claw Blanket and Modern Log Cabin.
Queued Up:
♥ Fruit Stripe Gum Socks -- mentioned Lollipalooza!
♥ Frances the Sock Wearing Fox
Spinning A Yarn:
♥ Hanks in the Hood batt: the end is near!
Stitcher's Corner:
♥ Halloween Spooky Sampler by Frosted Pumpkin Stitchery
Stash Enhancement:
♥ Chinese circular needles
♥ Pretty Purly stitch markers
15 November, 2013
2013 Crafting goals: revisited
I'm not going to lie, kittens. I went off-track from my crafting goals pretty early on in the year and then neglected to recheck them to remind myself what all it was I wanted to do. Earlier in the week I started to wonder how I had done on my goals...had I even made some this year? It turns out I had, and I was not alone in this line of thought. I felt the time is right to revisit my goals and see how well I have done with them.
All of this is prep-work for my 2014 craft goals...of course. You all know how I love that kind of thing. I have a few more weeks to refine them and smooth out the rough edges. Hard to believe the end of 2013 is nigh, isn't it?
So. Let's review, shall we?
♥ Work on Giftmas crafts throughout the year, preferably one every other month.
- 2 pairs of adult socks
- 1 pair of socks for each of my children
- a custom designed "wolfie" doll for The Girl
- a Batman doll for The Boy
- small ornaments for family and teacher gifts
* I have most of the yarn on-hand already for these projects.
> NONE OF THIS ONE HAPPENED. NOT EVEN A LITTLE. I'M JUST NOT A GIFTMAS KNITTER. 0% accomplished
♥ Knit 4 pairs of socks for myself out of existing stash. At least 2 should be self-striping.
> I MANAGED 2 PAIR: 1 WAS SELF-STRIPING. 50% accomplished
♥ Knit my winter coat. (This will be a 30 point project due to the amount of work and complexity. Point system to be detailed later in this post.)
> I DREW DIAGRAMS AND THOUGHT ABOUT IT...DOES THAT COUNT? NO? 0% accomplished
♥ Knit The Husband's socks before he leaves on his business trip. He has US size 13 feet: hold me, kittens.
>BUSINESS TRIP WAS CANCELLED. SOCKS WERE STARTED TOP-DOWN. NEED TO RIP AND RESTART TOE-UP. 0% accomplished
♥ Design a Shiba Inu toy and write up pattern.
> NOPE. 0% accomplished
♥ Finish Goodale sweater plus at least 2 others from stash.
> GOODALE. CHECK. POMME DE PIN. CHECK. 3RD SWEATER...LIKELY NOT FINISHED BY END OF DECEMBER. 67% accomplished
♥ Finish The Boy's wide stripes blanket.
> NOT FINISHED, BUT COULD BE. ~90% accomplished
♥ Finish the queen sized bed quilt.
> NOPE. DID DO A LITTLE MORE QUILTING HERE AND THERE. 55% accomplished
♥ Start new king sized bed quilt.
> NOPE. 0% accomplished
♥ Cross stitch 2012's Dessert of the Month sampler and start on 2013's Woodland Sampler.
> 2012 DESSERT SAMPLER. CHECK. 2013 WOODLAND SAMPLER. NOT STARTED...YET. THIS ONE IS VAGUE AND COULD BE EASILY DONE BEFORE THE END OF NEXT MONTH. 50% accomplished
♥ Only purchase yarn that has been earned with the "points system" to help keep stash in numbers low this year. The system is a little rough, but I think it could work.
> AHAHAHAHAHA. POINTS SYSTEM WAS A DEFINITE FAIL. I STASHED SUPER HARD EARLY ON. I DID GET BETTER THE SECOND HALF OF THE YEAR. 0% accomplished
There are a lot of zero percents on that list and no one hundreds, but it does look like, overall, I managed to knock out some large goals I had wanted to accomplish in the year. If you add what I wanted to get done with what I had actually gotten done...I've been pretty productive. It's looking good so far. Maybe I can turn one or two of those into 100%ers. ^_^
If you made goals, have you revisited them, kittens? How have you done? Did your focus change over the course of the year?
All of this is prep-work for my 2014 craft goals...of course. You all know how I love that kind of thing. I have a few more weeks to refine them and smooth out the rough edges. Hard to believe the end of 2013 is nigh, isn't it?
So. Let's review, shall we?
Crafting Goals for 2013:
♥ Work on Giftmas crafts throughout the year, preferably one every other month.
- 2 pairs of adult socks
- 1 pair of socks for each of my children
- a custom designed "wolfie" doll for The Girl
- a Batman doll for The Boy
- small ornaments for family and teacher gifts
* I have most of the yarn on-hand already for these projects.
> NONE OF THIS ONE HAPPENED. NOT EVEN A LITTLE. I'M JUST NOT A GIFTMAS KNITTER. 0% accomplished
♥ Knit 4 pairs of socks for myself out of existing stash. At least 2 should be self-striping.
> I MANAGED 2 PAIR: 1 WAS SELF-STRIPING. 50% accomplished
♥ Knit my winter coat. (This will be a 30 point project due to the amount of work and complexity. Point system to be detailed later in this post.)
> I DREW DIAGRAMS AND THOUGHT ABOUT IT...DOES THAT COUNT? NO? 0% accomplished
♥ Knit The Husband's socks before he leaves on his business trip. He has US size 13 feet: hold me, kittens.
>BUSINESS TRIP WAS CANCELLED. SOCKS WERE STARTED TOP-DOWN. NEED TO RIP AND RESTART TOE-UP. 0% accomplished
♥ Design a Shiba Inu toy and write up pattern.
> NOPE. 0% accomplished
♥ Finish Goodale sweater plus at least 2 others from stash.
> GOODALE. CHECK. POMME DE PIN. CHECK. 3RD SWEATER...LIKELY NOT FINISHED BY END OF DECEMBER. 67% accomplished
♥ Finish The Boy's wide stripes blanket.
> NOT FINISHED, BUT COULD BE. ~90% accomplished
♥ Finish the queen sized bed quilt.
> NOPE. DID DO A LITTLE MORE QUILTING HERE AND THERE. 55% accomplished
♥ Start new king sized bed quilt.
> NOPE. 0% accomplished
♥ Cross stitch 2012's Dessert of the Month sampler and start on 2013's Woodland Sampler.
> 2012 DESSERT SAMPLER. CHECK. 2013 WOODLAND SAMPLER. NOT STARTED...YET. THIS ONE IS VAGUE AND COULD BE EASILY DONE BEFORE THE END OF NEXT MONTH. 50% accomplished
♥ Only purchase yarn that has been earned with the "points system" to help keep stash in numbers low this year. The system is a little rough, but I think it could work.
> AHAHAHAHAHA. POINTS SYSTEM WAS A DEFINITE FAIL. I STASHED SUPER HARD EARLY ON. I DID GET BETTER THE SECOND HALF OF THE YEAR. 0% accomplished
There are a lot of zero percents on that list and no one hundreds, but it does look like, overall, I managed to knock out some large goals I had wanted to accomplish in the year. If you add what I wanted to get done with what I had actually gotten done...I've been pretty productive. It's looking good so far. Maybe I can turn one or two of those into 100%ers. ^_^
If you made goals, have you revisited them, kittens? How have you done? Did your focus change over the course of the year?
Subscribe to:
Posts (Atom)